Bruker Daltonik GmbH 3 Switching Off and Opening the Instrument
3 Switching Off and Opening the Instrument
3.1 Preparation
l Eject / remove the MALDI target plate to avoid damaging your samples.
l Move the sample holder to position A24 to enable better access to the P1-cable
contact pole.
l Close flexControl and flexService .
l The external nitrogen supply must be opened to allow ventilation of the vacuum
system.
3.2 Switching Off the Instrument
Figure 3-1 ultrafleXtreme— front view
ultraflex Series Cleaning Manual Revision 2 Page 19 of 44