Installation 1
Wall-mounted condensing gas boiler Buderus 800 - Subject to modifications resulting from technical improvements!
11
1.4 Items supplied with unit
Check the contents against the packing list to ensure
that nothing is missing.
Requirements to be met by the place of installation
1.5 Gas boiler
Remove the packing and discard to ensure proper
recycling.
Do not remove the polystyrene foam bottom slab
protecting the connection nozzles. During installation
the gas boiler and the flue gas adapter must be
protected to prevent site dirt from entering, e.g. using
aluminum foil.
Fit the wall bracket.
Removing the casing:
Open the cover of the control panel (fig. 5, item 1).
fig. 4 Items supplied with unit
Key to fig. 4:
1: wall-mounted condensing gas boiler
2: wall bracket
3: technical documents
4: wall-mounting template
5: screw fittings for connecting the boiler (heating system)
gas service valve ½" (800-24/29/43)
gas service valve ¾" (800-60)
2
3
5
1
4
6
NOTE
Observe all statutory building regulations
applying to the place of installation.
DANGER!
Inflammable materials or liquids must not be
stored or used near wall-mounted
condensing gas boilers. The site of
installation must be frost-protected.
fig. 5 Removing the casing
6
1
2
5
5
5
4
3
NOTE!
Note the clearance required to install the
flue system (see chapter 1.8 "Flue
installation").
Note the side wall minimum clearance of
100 mm. If a storage-type water heater is
installed underneath, take care that the
minimum clearances according to the
installation instructions are adhered to.