EasyManua.ls Logo

CAME ZL65 - INSTALLATION; Preparing the control panel

CAME ZL65
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 8 - Manual FA01359-EN - 03/2021 - © CAME S.p.A. - The contents of this manual may be changed at any time and without notice. - Translation of the original instructions
INSTALLATION
Preparing the control panel
1
Separate the parts of the control panel.
2
Drill the pre-marked holes. The diameter of the holes is 20 mm.

Related product manuals