EasyManua.ls Logo

Carrier 59SC2A - Page 2

Carrier 59SC2A
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
59SC2A
Required
Notice
for
Massachusetts
Installations
IMPORTANT
The
Commonweaith
of
Massachusetts
requires
compliance
with
regulation
248
CMR
as
follows:
5.08:
Modifications
to
NFPA-54,
Chapter
10
2)
Revise
10.8.3
by
adding
the
following
additional
requirements:
bo
a.
For
all
side
wail
horizontally
vented
gas
fueled
equipment
installed
in
every
dwelling,
building
or
structure
used
in
whole
or
in
part
for
residential
purposes,
including
those
owned
or
operated
by
the
Commonwealth
and
where
the
side
wall
exhaust
vent
termination
is
less
than
seven
(7)
feet
above
finished
grade
in
the
area
of
the
venting,
including
but
not
limited
to
decks
and
porches,
the
following
requirements
shail
be
satisfied:
.
INSTALLATION
OF
CARBON
MONOXIDE
DETECTORS.
At
the
time
of
installation
of
the
side
wall
horizontal
vented
gas
fueled
equipment,
the
installing
plumber
or
gasfitter
shail
observe
that
a
hard
wired
carbon
monoxide
detector with
an
alarm
and
battery
back-up
is
installed
on
the
floor
level
where
the
gas
equipment
is
to
be
installed.
In
addition,
the
installing
plumber
or
gasfitter
shall
observe
that
a
battery
operated
or
hard
wired
carbon
monoxide
detector with
an
alarm
is
installed
on
each
additional
level
of
the
dwelling,
building
or
structure
served
by
the
side
wall
horizontal
vented
gas
fueled
equipment.
It
shall
be
the
responsibility
of
the
property
owner
to
secure
the
services
of
qualified
licensed
professionals
for
the
installation
of
hard
wired
carbon
monoxide
detectors
a.
In
the
event
that
the
side
wall
horizontally
vented
gas
fueled
equipment
is
installed
in
a
crawl space
or
an
attic,
the
hard
wired
carbon
monoxide
detector with
alarm
and
battery
back-up
may
be
installed
on
the
next
adjacent
floor
level.
b.
In
the
event
that
the
requirements
of
this
subdivision
can
not
be
met
at
the
time
of
completion
of
installation,
the
owner
shall
have
a
period
of
thirty
(30)
days
to
comply
with
the
above
requirements;
provided,
however,
that
during
said
thirty
(30)
day
period,
a
battery
operated
carbon
monoxide
detector with
an
alarm
shall
be
installed.
.
APPROVED
CARBON
MONOXIDE
DETECTORS.
Each
carbon
monoxide
detector
as
required
in
accordance
with
the
above
provisions
shall
comply
with
NFPA
720
and
be
ANSI/UL
2034
listed
and
IAS
certified.
.
SIGNAGE.
A
metal
or
plastic
identification
plate
shall
be
permanently
mounted
to
the
exterior
of
the
building
at
a
minimum
height
of
eight
(8)
feet
above
grade
directly
in
line
with
the
exhaust
vent
terminal
for
the
horizontally
vented
gas
fueled
heating
appliance
or
equipment.
The
sign
shall
read,
in
print
size
no
less
than
one-half
(1/2)
inch
in
size,
"GAS
VENT
DIRECTLY
BELOW.
KEEP
CLEAR
OF
ALL
OBSTRUCTIONS”.
.
INSPECTION.
The
state
or
local
gas
inspector
of
the
side
wall
horizontally
vented
gas
fueled
equipment
shail
not
approve
the
installation
unless,
upon
inspection,
the
inspector
observes
carbon
monoxide
detectors
and
signage
installed
in
accordance
with
the
provisions
of
248
CMR
5.08(2)(a)1
through
4.
.
EXEMPTIONS:
The
following
equipment
is
exempt
from
248
CMR
5.08(2)(a)1
through
4:
(1.)
The
equipment
listed
in
Chapter
10
entitled
"Equipment
Not
Required
To
Be
Vented”
in
the
most
current
edition
of
NFPA
54
as
adopted
by
the
Board;
and
(2.)
Product
Approved
side
wall
horizontally
vented
gas
fueled
equipment
installed
in
a
room
or
structure
separate
from
the
dwelling,
building
or
structure
used
in
whole
or
in
part
for
residential
purposes.
ce.
MANUFACTURER
REQUIREMENTS
-
GAS
EQUIPMENT
VENTING
SYSTEM
PROVIDED.
When
the
manufacturer
of
Product
Approved
side
wall
horizontally
vented
gas
equipment
provides
a
venting
system
design
or
venting
system
components
with
the
equipment,
the
instructions
provided
by
the
manufacturer
for
installation
of
the
equipment
and
the
venting
system
shall
include:
1.
Detailed
instructions
for
the
installation
of
the
venting
system
design
or
the
venting
system
components;
and
bo
bo
.
A
complete
parts
list
for
the
venting
system
design
or
venting
system.
d.
MANUFACTURER
REQUIREMENTS
-
GAS
EQUIPMENT
VENTING
SYSTEM
NOT
PROVIDED.
When
the
manufacturer
of
a
Product
Approved
side
wall
horizontally
vented
gas
fueled
equipment
does
not
provide
the
parts
for
venting
the
flue
gases,
but
identifies
“special
venting
systems”,
the
following
requirements
shall
be
satisfied
by
the
manufacturer:
.
The
referenced
“special
venting
system”
instructions
shall
be
included
with
the
appliance
or
equipment
installation
instructions;
and
.
The
“special
venting
systems”
shall
be
Product
Approved
by
the
Board,
and
the
instructions
for
that
system
shall
include
a
parts
list
and
detailed
installation
instructions.
e.
A
copy
of
all
installation
instructions
for
all
Product
Approved
side
wall
horizontally
vented
gas
fueled
equipment,
all
venting
instructions,
all
parts
lists
for
venting
instructions,
and/or
all
venting
design
instructions
shall
remain
with
the
appliance
or
equipment
at
the
completion
of
the
installation.
For
questions
regarding
these
requirements,
please
contact
the
Commonwealth
of
Massachusetts
Board
of
State
Examiners
of
Plumbers
and
Gas
Fitters,
239
Causeway
Street,
Boston,
MA
02114.
617-727-9952.
bo

Other manuals for Carrier 59SC2A

Related product manuals