EasyManua.ls Logo

Carrier 59SC2A - Minimum Clearances to Combustible Materials

Carrier 59SC2A
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.
Disconnect
all
power
to
the
furnace.
Multiple
disconnects
may
be
required.
DO
NOT
TOUCH
THE
CONTROL
OR
ANY
WIRE
CONNECTED
TO
THE
CONTROL
PRIOR
TO
DISCHARGING
YOUR
BODY’S
ELECTROSTATIC
CHARGE
TO
GROUND.
.
Firmly
touch
the
clean,
unpainted,
metal
surface
of
the
fur-
nace
chassis
which
is
close
to
the
control.
Tools
held
in
a
person’s
hand
during
grounding
will
be
satisfactorily
dis-
charged.
bo
3.
After
touching
the
chassis,
you
may
proceed
to
service
the
control
or
connecting
wires
as
long
as
you
do
nothing
to
recharge
your
body
with
static
electricity
(for
example;
DO
NOT
move
or
shuffle
your
feet,
do
not
touch
ungrounded
objects,
etc.).
4. If
you touch
ungrounded
objects
(and
recharge
your
body
with
static
electricity),
firmly
touch
a
clean,
unpainted
metal
surface
of
the
furnace
again
before
touching
control
or
wires.
5.
Use
this
procedure
for
installed
and
uninstalled
(ungroun-
ded)
furnaces.
6.
Before
removing
a
new
control
from
its
container,
discharge
your
body’s
electrostatic
charge
to
ground
to
protect
the
control
from
damage.
If
the
control
is
to
be
installed
in
a
furnace,
follow
items
1
through
4
before
bringing
the
con-
trol
or
yourself
in
contact with
the
furnace.
Put
all
used
and
new
controls
into
containers
before
touching
ungrounded
objects.
7.
An
ESD
service
kit
(available
from
commercial
sources)
may
also
be
used
to
prevent
ESD
damage.
ACCESSORIES
See
Product
Data
Sheet
for a
list
of
accessories
for
this
product.
Table
1
Factory-Supplied
Installation
Parts
DESCRIPTION
QUANTITY
Outlet
Choke
Plate
(provided
with
40K
BTUH
furnaces
only;
see
Note)
Air
Intake
Pipe
Flange
Vent
Pipe
Flange
Pipe
Flange
Gaskets
Sharp
Tip
Screws
(Vent
and
Inlet
Flanges)
Vent
Pipe
Coupling
Vent
Pipe
Coupling
Clamps
Pressure
Switch
Tube
Rubber
Drain
Elbow
Drain
Tube
Clamps
1/2-in.
CPVC
to
3/4—in.
PVC
Pipe
Adapter
Gas
Line
Grommet
Junction
Box
Cover
Junction
Box
Base
Green
Ground
Screw
Blunt
Tip
Screws
(Junction
Box)
Thermostat
Wire
Grommet
Drain
Extension Tube
(Z—pipe)
(Provided
separately
in
furnace)
+)
4)
a)
+)
+)
4)
+)
+)
a8)
+)+)m)
=)
S)m)s)-)-
NOTE:
Only
used
for
40K
BTUH
furnaces
from
0-2000
ft.
(0
to
610
M) above
sea
level
for total
equivalent
vent
lengths
under
10
ft.
(3
M)
Table
2
Minimum
Clearances
to
Combustible
Materials
for
All
Units
POSITION
CLEARANCE
REAR
oO
FRONT
(Combustion
air
openings
in
furnace
and
in
structure)
1
in.
(25
mm)
Required
for
service
*24
in.
(610
mm)
All
Sides
of
Supply
Plenum
*41
in.
(25
mm)
Sides
0
Vent
0
Top
of
Furnace
1
in.
(25
mm)
*Consult
local
building
codes.
59SC2A

Other manuals for Carrier 59SC2A

Related product manuals