Fan motor connection
short/ open
Check wire condition of motor, it
should be in proper condition.
Check continuity of wires with
connector on PCB using
multimeter.
Power Supply Open at
CDU pcb
Check voltage on power
connector "P2" as well as voltage
on mains using multimeter on AC
mode.
Check harness using Multimeter
on continuity mode.
Communication to indoor
Open/short/reverse
connection at CDU pcb
Check connection on all PCB.
Check connector on PCBs.
Communication to drive
Open/short/reverse
connection at CDU pcb
Check connection on all PCB.
Check connector on PCBs.
Temperature
sensor
Short/Open
Check Wiring connection plus
connector of sensor on PCB.
Check Resistance value of sensor
with multimeter.
Check wire insulation ,it should be in
proper condition.
Check Wiring connection plus
connector of sensor on PCB.
Check Resistance value of sensor
with multimeter.
Check wire insulation ,it should be in
proper condition.
Check Wiring connection plus
connector of sensor on PCB.
Check Resistance value of sensor
with multimeter.
Check wire insulation ,it should be in
proper condition.
Check Wiring connection plus
connector of sensor on PCB.
Check Resistance value of sensor
with multimeter.
Check wire insulation ,it should be in
proper condition.
Check ice formation on Coils and
close the unit to melt them.
Check pressure of gases in the coils
and if required, clean the filters.
Check pipe sensors.
Blower connection
short/open
Check wire condition of motor, it
should be in proper condition.
Check continuity of wires with
connector on PCB using multimeter.