EasyManua.ls Logo

Carrier p3 series - Outdoor Unit Wiring

Carrier p3 series
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
Remove the service cover of the outdoor unit, and connect the end of the connection cord with screws to the terminal block. ( Refer to wiring diagram inside
the top cover and caution label on the service cover)
When connections are completed, fasten the connection cord with the cable clamp and reinstall the service cover. ( Figure. 20 )
OUTDOOR UNIT WIRING
For Cooling Only Model
For Heat Pump Model
NOTE
The air conditioner always requires grouding
Be sure to comply with local codes on running the wire from the indoor unit to the outdoor unit.
Every wire must be connected firmly.
Use connection cable H07(H05,A07,A05)RN-F 1.5mm, synthetic rubber insulation with Neoprene coating,
according to EN(IEC) 60335-2-40 and HD277.S1 standards.
During installation, proceed first with refrigerant connections between indoor and outdoor units, and only then
make the electrical ones;similarly, when disassembling, disconnect the electrical wiring first and only then open refrigerant connections.
Ground connection between ID and OD is made through refrigerant pipes.
Unit must be installed according to applicable national installation standards.
2
Figure
21
Terminal block
Cable clamp
Ground screw
Terminal block
Cable clamp
Ground screw

Related product manuals