PG96MSA: Installation, Start-up, Operating and Service and Maintenance Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
26
A12226
Fig. 34 – Installing J-Box (When Used)
The J-Box cover, mounting bracket and screws are shipped in the loose
parts  bag  included  with  the  furnace.  See  Fig. 34  for  J-Box  mounting
locations.
The  J-Box  mounting  bracket  and  green  ground  screw  is  used  as  a
grounding point for all line voltage wiring options. The J-Box cover may
be  omitted  when  electrical  connections  are  made  inside  an  external
electrical box mounted external to the casing.
External Electrical Box on Furnace Casing 
NOTE:   Check to ensure that external electrical box does not interfere
with  duct  work,  gas  piping  or  the  indoor  coil  drain.  See  Fig. 30  for
alternate electric entry through top panel.
1. Select and remove 7/8-in. (22 mm) knockout or plug on the desired
side of the casing. Remove the knockout or plug from the casing. 
A190278
Fig. 35 – Field-Supplied External Electrical Box on Furnace Casing
NOTE: If electrical entry through the furnace top panel is used, a 7/8-in.
(22 mm) hole must be drilled through the top panel. 
2. Drill two (2) 1/8-in. (3 mm) pilot holes through the dimples in the
furnace casing near the 7/8-in. hole.
For a side-mounted external electrical box, complete 
the following:
1. Align the  J-Box  bracket  with the  7/8-in.  (22 mm) hole  inside the
furnace casing. 
2. Install the threaded end of a strain-relief bushing through the J-Box
bracket  and  the  furnace  casing.  Strain-relief  bushing  should  be
installed  so  that  the  bushing  can  be  tightened  around  the  wiring
harness inside the furnace casing. 
3. Align the external electrical box with the 7/8-in. (22 mm) hole.
4. Install  and  tighten the lock-nut  on  the strain-relief bushing inside
the external electrical box. 
5. Fasten  the external  electrical box to the  furnace casing using  two
(2) sheet metal screws.
6. Route field power wiring into external electrical box.
7. Pull furnace line voltage power wires through strain-relief bushing
of the external electrical box.
8. Pull  the  ground  wire  of  the  field  line  voltage  wiring  through  the
strain-relief bushing into the furnace casing.
9. Install the green ground screw to the J-Box bracket and attach both
ground wires to the green ground screw.
10. Connect  any  code  required  external  disconnect(s)  to  field  power
wiring.
NOTE: Connect field  power and neutral leads to furnace  power leads
inside the external electrical box as shown in Fig. 31. 
NOTE: If electrical entry through the furnace  top panel is used,  mark
the  screw  hole  locations  using  the  mounting  holes  in  the  external
electrical box as a template.
For a top panel-mounted external electrical box, 
complete the following:
1. Drill two (2) 1/8-in. (3 mm) pilot holes through the dimples in the
furnace casing near the 7/8-in. knockout or plug on the side of the
casing.  Do  not  remove  the  knockout  or  plug  in  the  side  of  the
casing.
2. Align  the  J-Box  bracket  with  the  pilot  holes  inside  the  furnace
casing.
3. Install  2  screws  through  the  outside  of  the  casing  to  secure  the
J-Box bracket to the furnace casing.
4. Route field power wiring into external electrical box.
5. Pull furnace line voltage power wires through strain-relief bushing
of the external electrical box.
6. Pull  the  ground  wire  of  the  field  line  voltage  wiring  through  the
strain-relief bushing into the furnace casing.
7. Install the green ground screw to the J-Box bracket and attach both
ground wires to the green ground screw.
8. Connect  any  code  required  external  disconnect(s)  to  field  power
wiring.
9. Connect field power and neutral leads to furnace power leads inside
the external electrical box as shown in Fig. 33.
Power Cord Installation in Furnace J-Box
NOTE:  Power cords must be able to handle the electrical requirements
listed in Table 11. Refer to power cord manufacturer’s listings.
1. Install  J-Box  mounting  bracket  to  inside  of  furnace  casing.  See
Fig. 34.
2. Route listed power cord through 7/8-in. (22 mm) diameter hole in
casing and J-Box bracket.
3. Secure power cord to J-Box bracket with a strain relief bushing or a
connector approved for the type of cord used.
GROUND
NEUTRAL
LINE VOLTAGE