EasyManua.ls Logo

CEM MARSXpress Plus - Routine Maintenance; Routine Maintenance: After Every Use; Routine Maintenance: As Needed; Routine Maintenance: Annually

CEM MARSXpress Plus
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22 Routine Maintenance
Routine Maintenance
A routine maintenance protocol is vital for the long-term operation of the vessels. For maintenance instructions for
MARS 6 instrument, see the MARS 6 iWave Manual (P/N 600832) or MARS 6 IR Manual (P/N 600284).
After Every Use
• Clean all vessel components. See “Cleaning and Inspection” section of this manual.
• Wipe inside of MARS cavity, including the sensors, with a lint free damp cloth.
• Inspect liners, plugs, caps and sleeves - See “Cleaning and Inspection” for acceptable wear on these
components.
As Needed
• Bake-out Procedure: See “Liner Bake-out Procedure” for detailed instructions. The bake-out procedure can be
used to remove residual acid vapors and other trapped gases from the Teon® material.
Annually
• Contact CEM Service Department, local CEM subsidiary or authorized dealer for information on CEM Service
contracts.

Related product manuals