EasyManua.ls Logo

CESAB B 200 - Page 378

CESAB B 200
460 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12-44
REMOVAL • INSTALLATION
Note:
The explanation here is for the flow regulator valve for all the mast.
Tightening torque T=Nm
Removal procedure
1. Set the mast in vertical position and lift it up to reach the valve.
2. Disconnect the battery connector
3. Fix the mast with a chain-belt or with wood blocks in order to avoid the mast lowering.
4. Disconnect the flexible hose that connected to the control valve A
5. Remove the lowering valve
Installation procedure
The reassembly procedure is the reverse of the disassembly procedure.
2M TV 3M TV 2M FFL 3M FFL
A = 100 Nm
https://www.forkliftpdfmanuals.com/

Table of Contents