EasyManua.ls Logo

Chamberlain CSL24UL - Step 2 Install the Operator

Chamberlain CSL24UL
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
Step 2 Install the Operator
Attach the operator to the concrete pad with appropriate fasteners. The gate operator should be installed near the front roller of the gate or near the back of
the gate (in the OPEN position). The space between the gate and the output sprocket must be a minimum of 4 inches (10.2 cm). NOTE: An alternative to a
concrete pad is to post mount the operator (refer to Accessories).
INSTALLATION

Table of Contents

Related product manuals