18
DUAL GATE WIRE TYPE (SHIELDED TWISTED PAIR CABLE)
22AWG up to 200feet (61m) 18AWG - 200-1000feet (61-305m)
Wire must be rated at 30 Volt minimum
Wired setup
Before digging, contact local underground utility locating companies. Use
PVC conduit to prevent damage to cables.
1. Disconnect ALL power to the operator.
2. Trench across driveway to bury the shielded twisted pair cable.
3.
Connect the wires from the shielded twisted pair cable to the Com Link terminals on the primary gate operator control board. NOTE: We recommend
that all accessories and board configurations are set on the primary operator.
4. Route the shielded twisted pair cable to the secondary gate operator's control board.
5. Connect the wires from the shielded twisted pair cable to the Com Link terminals on the secondary control board (Com Link A to Com Link A and Com
Link B to Com Link B). Ground the shield of the cable to the chassis ground of one operator.
6. Connect ALL power to the operator.
Step 8 install the Cover
Before installing the cover, follow the instructions in the Adjustment
section to set the handing and limits.
1. Slide the cover over the operator.
2. Align the hole in the cover with the threaded hole in the operator's
chassis and secure the cover with the provided screw.