23
Installation and use of the gun
The gun and the earth clamp are optional. Ref: CEL051010
(1) (2)
- Select the clamp adjustment mode in the menus, in order to stop the pump and the flow of cooling liquid.
- Fix the earth cable on the removable electrode; put the clamp and tighten the lever.
- Remove the arm from the top and put the gun cable instead of that one.
(3) (4)
Connect the cooling liquid pipes to the 2 connectors. Connect the command cable to the Jack plug.
(5)
- Check if the screw connected from the earth plate to the earth clamp terminal is tightened correctly.