EasyManua.ls Logo

Cisco ASR 920 series

Cisco ASR 920 series
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 5 Tighten the captive installation screws of the power supply. The recommended maximum torque is 5.5 in.-lb
(0.62 N-m).
Figure 52: Installing the DC Power Supply Module
Activate a DC Power Supply Module
Perform the following procedure to activate a DC power supply:
Procedure
Step 1 Remove the tape from the circuit-breaker router handle, and restore power by moving the circuit-breaker
router handle to the On (|) position.
Step 2 Verify power supply operation by checking if the respective power supply front panel LED (PS0 or PS1) is
green.
Step 3 If the LEDs indicate a power problem, see Troubleshooting.
Step 4 If you are connecting a redundant DC power supply, repeat these steps for the second power source.
Installing the Cisco ASR 920 Series Router
57
Installing the Cisco ASR 920 Series Router
Activate a DC Power Supply Module

Other manuals for Cisco ASR 920 series

Related product manuals