This figure shows a stack with a bad link B. This stack partitions into two stacks, and switch 1 and switch 3
are stack masters.
Figure 15: Partitioned Stack with a Failover Condition
Power-On Sequence for Switch Stacks
Consider these guidelines before you power on the switches in a stack:
The sequence in which the switches are first powered on might affect the switch that becomes the stack
master.
If you want a particular switch to be the stack master, power on that switch first. This switch becomes
the stack master and remains the stack master until a master reelection. After 2 minutes, power on the
other stack switches.
If you have no preference as to which switch becomes the stack master, power on all the switches in the
stack within a 1-minute timeframe. These switches participate in the stack master election. Switches
powered on after the 1-minute timeframe do not participate in the election.
Power off a switch before you add it to or remove it from an existing switch stack.
For conditions that can cause a stack master reelection or to manually elect the stack master, see the Catalyst
2960-X Switch Stacking Configuration Guide or Catalyst 2960-XR Switch Stacking Configuration Guide on
Cisco.com.
Installing the Switch
Rack-Mounting
Installation in other than 19-inch racks requires a bracket kit not included with the switch.
Catalyst 2960-X and 2960-XR Switch Hardware Installation Guide
OL-28309-02 33
Switch Installation
Power-On Sequence for Switch Stacks

Table of Contents

Other manuals for Cisco Catalyst 2960-X

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco Catalyst 2960-X and is the answer not in the manual?

Cisco Catalyst 2960-X Specifications

General IconGeneral
Console portRJ-45
USB 2.0 ports quantity2
SFP module slots quantity4
Installed SFP modules quantity-
Gigabit Ethernet (copper) ports quantity48
Basic switching RJ-45 Ethernet ports typeGigabit Ethernet (10/100/1000)
Power sourceAC
Input current5 A
AC input voltage100 - 240 V
Power consumption (typical)60.9 W
Number of power supply units1
Redundant power supply (RPS) supportYes
Operating altitude0 - 3000 m
Non-operating altitude0 - 4000 m
Storage temperature (T-T)-25 - 70 °C
Operating temperature (T-T)-5 - 40 °C
Operating relative humidity (H-H)10 - 95 %
Switching protocolsUDP, TCP, RADIUS/TACACS+
Number of VLANs1023
Networking standardsIEEE 802.1ab, IEEE 802.1D, IEEE 802.1p, IEEE 802.1Q, IEEE 802.1s, IEEE 802.1w, IEEE 802.1x, IEEE 802.3, IEEE 802.3ab, IEEE 802.3ad, IEEE 802.3ae, IEEE 802.3af, IEEE 802.3ah, IEEE 802.3at, IEEE 802.3az, IEEE 802.3u, IEEE 802.3x, IEEE 802.3z
Throughput107.1 Mpps
Jumbo frames9216
Number of queues8
MAC address table16000 entries
Number of static routes1000
DHCP featuresDHCP server
AuthenticationMAC-based authentication, Port-based authentication
Security algorithms802.1x RADIUS, SNMP, SSH
Access Control List (ACL) rules3
Switch typeManaged
Switch layerL2/L3
SafetyUL 60950-1, CAN/CSA-C22.2 No. 60950-1, EN 60950-1, IEC 60950-1, AS/NZS 60950-1
Form factor1U
Product colorBlack
Total Power over Ethernet (PoE) budget370 W
Power over Ethernet (PoE) ports quantity24
Power over Ethernet plus (PoE+) ports quantity12
Memory typeDRAM
Noise level39 dB
Flash memory128 MB
Internal memory512 MB
Processor frequency600 MHz
Mean time between failures (MTBF)276870 h
Weight and Dimensions IconWeight and Dimensions
Depth368 mm
Width445 mm
Height45 mm
Weight5800 g