G-1
Cisco Nexus 5600 Series Hardware Installation Guide
APPENDIX
G
Site Planning and Maintenance Records
This appendix provides log sheets that you can use to record information when installing a Cisco Nexus
5600 Series switch.
This appendix includes the following sections:
• Site Preparation Checklist, page G-1
• Contact and Site Information, page G-3
• Chassis and Module Information, page G-4
Note For information about how to query the switch for configuration information, see the appropriate Cisco
Nexus 5600 Series CLI configuration guide.
Site Preparation Checklist
Planning the location and layout of your equipment rack or wiring closet is essential for successful
switch operation, ventilation, and accessibility. Table G-1 lists the site planning tasks that we
recommend completing before installing a Cisco Nexus 5600 Series switch.
Consider heat dissipation when sizing the air-conditioning requirements for an installation. For power
and heat ratings, see the environmental requirements and the power specifications in Appendix B,
“Technical Specifications.”