D-12
Cisco UCS C240 M4 Server Installation and Service Guide
OL-32474-01
Appendix D GPU Card Installation
Figure D-5 Air Baffle Filler Panel and Bridge
Step 19
Install the bridge to the air baffle. Ridges on the bridge legs slide into slots on the air baffle base (see
Figure D-5).
Step 20 If the server has a SuperCap power module (RAID battery unit), install it to the holding clip on the new
air baffle (see Figure D-5).
a. Set the module into the clips and gently press down until the clip closes over the module.
b. Route the module’s cable through the opening in the air baffle (see Figure D-5) so that it does not
interfere with the server top cover.
Step 21 Replace the top cover to the server.
Step 22 Replace the server in the rack, replace cables, and then power on the server by pressing the Power button.
Step 23 Continue with Installing Drivers to Support the NVIDIA GPU Cards, page D-31.
1 Air baffle base 4 Holding clip for SuperCap module (RAID battery)
2 Filler panel 5 Path for SuperCap module cable through air baffle
opening (SuperCap module not shown)
3 Bridge