Hawk 1000 Section 3 — Hardware Checkout
Part No. 750-366 3-3
3.1.2 Panel and Field Wiring Terminations
Check that all factory wiring connections are tight and that field wiring terminations are completed and secure.
3.1.3 SM2 Module DIP Switch
Verify that the SM2 Module DIP switch setting is as shown below (the top switch is to the left, the bottom
switch is to the right).
Figure 3-3. Check all wiring and connections
Figure 3-4. SM2 module DIP switch setting
DIP switch
settings: Top L,
Bottom R