9.1 Recommended periodical checks sheet
Notes/interventions recommended to Owner
* Refer to the local implemented standards.
Companies and technicians carrying out installation, maintenance/repair interventions, leaks check and recovery must be CERTIFIED as
foreseen by the local standards.
The leaks check must be carried out on a yearly basis
9 - MAINTENANCE
Checks carried out on…………………….......by……………………………...………….company…..............…………………………………………….
√
intervention frequency (months)
1 6 12
□
presence corrosion
□
panel fixing
□
fans fixing
□
coil cleaning
□
bowl cleaning + sanitisation
□
outflow test
□
air filters cleaning/inspection
□
air flow rate measurement
□
channelling: anti-vibration devices and fastenings check
□
power supply cable isolation and fastening check
□
earth cable check
□
electric control board cleaning
□
power remote controls state
□
clamps closure, cables isolation integrity
□
phases unbalancing and power supply voltage (vacuum and loaded)
□
absorption of the individual electric loads
□
compressors carter heaters test
□
leaks control *
□
cooling circuit work parameters detection
□
four-way valve exchange check
□
safety valves
*
□
protective equipment test: pressure switches, thermostats, flow meters, etc.
□
protective equipment test: setpoint, climatic compensations, power slicing, air flow rate variations
□
control devices test: alarms signal, thermometers, probes, pressure gauges, etc.
□
electrical heaters check - option
□
water coil check - option