©Ecoflo Wastewater Management Pty LtdIMCM-203-2023.08.30
6
STEP 3: INSTALL THE WASTE CHUTE
First ensure the pad or ground on which the ‘In-service’ chamber will reside is at its final level beneath
the toilet room. It is recommended to install a concrete pad/tiles for the chamber to sit on.
Insert the chute into the
hole
1
2
4
5 6
3
Slide the lid up the chute.
Cut off any excess chute length
20mm below the mark.
Seal and secure the chute to the
floor with silicone.
Follow the separate pedestal
instruction sheet to install the
pedestal.
Place the chamber in position
and lower the lid. Mark where the
chute meets the hole in the lid.
20mm below