EasyManua.ls Logo

CNC-Step High-Z T-Series - Maintenance Schedule

CNC-Step High-Z T-Series
79 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating Instructions
High-Z T-Series
CNC-STEP GmbH & Co. KG Siemensstrasse 13-15 ▪ 47608 Geldern ▪ Germany
Page 62
Support: +49 (0)2831/91021-50
15.02.2014
8.3 Maintenance Schedule
In the following sections, the maintenance is described that is necessary for optimum and trouble-
free operation of the machine.
If increased wear can be seen during regular inspections reduce the required maintenance intervals
according to the actual wear and tear. For questions about maintenance work and intervals, contact
the manufacturer.
Refer to the separate operating instructions, for the maintenance of the supplied
components.
Modell HIGH-Z Series S-400T / S-720T / S-1000T
Interval
Maintenance
To be carried out by
Daily
Cleaning the machine
Operator
Check the machine for damage and wear
qualified personnel
10 Hours
Grease Trapezoidal Thread Spindle and ball
screws
qualified personnel
Oil linear guides
qualified personnel
50 Hours
Grease motor bearings through the provided
funnel type lubrication fitting
qualified personnel
As required
Clean the machine from the outside with a cloth
DIN 61650
Operator

Table of Contents

Related product manuals