EasyManua.ls Logo

Comtec 2200 - Page 27

Comtec 2200
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MODEL 2200
www.comtecltd.com For Kasco Corp use only.
16
CAUTION: HEATING ELEMENTS CAN REACH HIGH TEMPERATURES
DURING USE. ALWAYS ALLOW SUFFICIENT TIME FOR HEATING
ELEMENTS TO COOL DOWN BEFORE ATTEMPTING TO SERVICE
THEM.
Figure 10 Removing Heater Cover
Figure 11 Heater Assembly Removed
If authorized by Comtec, the hydraulic system can be serviced by removing the four
screws in the base cover plate on top of the reservoir. The base cover plate with the
motor, and the upper and lower die assemblies can then be removed from the
reservoir. The base cover plate can be turned upside down and placed on two (2) 1” x
2” wood strips for ease of servicing. (See Figure 12)
Figure 12 Base Cover Removed and Inverted