Custers Hydraulica B.V. Venray NL
26-mrt-
20 www.custers.nl
11
Fig.11
9: Place the platform with hatch (on the
5
th
rung from the top) on the façade
side;
10: Slide both blow-away protections
under the rung;
11: Lock the brakes and set the
scaffold level by twisting the
spindle nut of the casters;
Fig.12
Now place the four (large or small)
outriggers:
12: Place the upper coupler under the 6
th
or
7
th
rung at the small leg, 9
th
or 10
th
rung at
the large leg;
13: Put the foot on the ground with
observance of the designated basic form
(see 4.4);
14: Make sure that the lower coupler falls
between two rungs;
Fig.13
15: Rotate the leg in such a way that the
designated basic form (see
4.4) is maintained;
16: Tighten the lower coupler
by hand on the upright and slide the
coupler upwards over the upright so
that the leg is slightly tensioned;
17: Slightly tighten both couplers;
18: Climb to the 2m. level through the
hatch;