Custers Hydraulica B.V. Venray NL
26-mrt-
20 www.custers.nl
12
Fig.14
19: Place both 8-rung frames;
20: Place locking pins between the
frames themselves;
21: Place two Safe Guard guardrail frames
on the upper rung: one to the
façade side and the other in
the middle of the rungs. Click the
diagonal ledgers in place on the 5
th
rung of the frame in question;
Fig.15
22: Place the platform with hatch
to façade side (on the 5
th
rung from the top);
23: Slide both blow-away protections
under the rung;
Fig.16
24: Climb to the next level through
the hatch;