Custers Hydraulica B.V. Venray NL
26 maart 2020 www.custers.nl 29
Fig.62
30: Place the platform with hatch (on the
5
th
rung from the top); slide both
blow-away protections under the
rung;
Fig.63
31: Climb to the upper level
through the hatch;
32: Place the four toe board brackets;
33: Place both end toe boards
34: Place both longitudinal toe boards.
The above shows the assembly of the freestanding mobile scaffold tower. If the mobile
scaffold tower is placed against the façade (distance between façade and platform not larger
than 15 cm) the edge protection (guardrail at hip height, knee railing and toe board) on the
façade side may be omitted.