Fig.59
25: Place the platform with hatch;
slide both blow-away protections
under the rung;
Fig.60
26: Climb to the next level through the
hatch;
Fig.61
27: Place both 8-rung frames;
28: Place locking pins between the
frames themselves;
29: Place two Safe Guard guardrail frames
on the upper rung and click the
diagonal ledgers in place on the 5
th
rung of the frame in question;