Do you have a question about the CYPRES 2 and is the answer not in the manual?
Explains the core purpose and design principles of CYPRES.
Important safety guidelines for handling the CYPRES unit.
Explains the possibility and procedure for converting between CYPRES 2 models.
Details compatibility with different reserve container types.
Information on selecting altitude display units (feet or meters).
Official notice regarding parachute manufacturer approvals for AAD installation.
Warning regarding retrofit installation procedures.
Instructions on how to use the control unit's button for various functions.
Instructions for setting the dropzone offset based on elevation differences.
Critical operational notes specifically for jump pilots.
Explains the core purpose and design principles of CYPRES.
Important safety guidelines for handling the CYPRES unit.
Explains the possibility and procedure for converting between CYPRES 2 models.
Details compatibility with different reserve container types.
Information on selecting altitude display units (feet or meters).
Official notice regarding parachute manufacturer approvals for AAD installation.
Warning regarding retrofit installation procedures.
Instructions on how to use the control unit's button for various functions.
Instructions for setting the dropzone offset based on elevation differences.
Critical operational notes specifically for jump pilots.
| Category | Automatic Activation Device (AAD) |
|---|---|
| Manufacturer | Airtec GmbH |
| Power Source | Lithium battery |
| Certification | TSO-C23d |
| Water Resistance | Yes (IP67) |
Loading...