EasyManua.ls Logo

Daikin BRC2E61 - Dry Operation

Daikin BRC2E61
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
10.2
Dry operation
Preparation
• Formechanicalprotectionpurpose,turnonthepowertotheairconditioneratleast6hoursbefore
starting the operation.
•
Drymodemaynottobeselected,iftheremotecontrollerhasnoeligibilitytoselectCooling/Heating
mode (Refer to page 26 for details).
Operation
1
• Press the Mode Selector button ( ) several
times until Dry mode is selected.
Dry mode may not be available depending on
the type of indoor unit.
2
• PressON/OFFbutton( ).
Theoperationlamp(green)willbelitandtheair
conditionerwillstartoperating.
The air conditioner controls temperature and
airowrateautomatically.Therefore,the
temperatureorairowratesettingsarenot
availablewhiletheairconditionerisin
operation.
3
• WhenON/OFFbutton( )ispressedagain,the
airconditionerwillstopoperatingandthe
operationlampwillbeturnedoff.
Note:
• Topreventwaterleakageorsystemfailure,donotturnoffthe
powerimmediately.Waitatleast5minutesforthedrainpumpto
nishdrainingresidualwaterfromtheindoorunit.
01_EN_4P543053-1C.indd 24 10-May-19 4:13:28 PM

Related product manuals