TRIAL OPERATION AND TESTING
(1) Measure the supply voltage and make sure that it falls in the specified range.
(2) Trial operation should be carried out in either cooling or heating mode.
In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable temperature.
Trial operation may be disabled in either mode depending on the room temperature.
After trial operation is complete, set the temperature to a normal level (79°F to 82°F in cooling mode, 68°F to 75°F in heating
mode).
For protection, the system disables restart operation for 3 minutes after it is turned off.
(3) Carry out the test operation in accordance with the Operation Manual to ensure that all functions and parts, are working
properly.
* The air conditioner requires a small amount of power in its standby mode. If the system is not to be used for some time after
installation, shut off the circuit breaker to eliminate unnecessary power consumption.
* If the circuit breaker trips to shut off the power to the air conditioner, the system will restore the original operation mode when
the circuit breaker is turned on again.
(1) Press ON/OFF button to turn on the system.
(2) Simultaneously press center of TEMP button and MODE button.
(3) Press MODE button twice.
(“ ” will appear on the display to indicate that Trial Operation mode is selected.)
(4) Trial operation mode terminates in approx. 30 minutes and switches into normal mode. To quit the trial operation, press
ON/OFF button.
Trial operation from remote controller
C
hec
k
S
ympto
m
(
diagnostic display on R
C)
T
est
i
tem
s
I
n
d
oor an
d
out
d
oor un
i
ts are
i
nsta
ll
e
d
proper
l
y on so
lid
b
ases
.
No re
f
rigerant gas leaks
.
Re
f
rigerant gas and liquid pipes and indoor drain hose
extens
i
on are t
h
erma
ll
y
i
nsu
l
ate
d.
D
ra
i
n p
i
pe
i
s proper
l
y
i
nsta
ll
e
d.
Sy
stem is properl
y
g
rounded
.
The speci
f
ied wires are used
f
or interconnecting wire
connect
i
ons
.
I
n
d
oor or out
d
oor un
i
t
s air inlet or discharge has clear path o
f
air
.
S
hut-o
ff
valves are opened
.
I
n
d
oor un
i
t proper
l
y rece
i
ves remote contro
ll
er comman
d
s
.
F
a
ll,
v
ib
rat
i
on
,
no
i
s
e
I
ncomp
l
ete coo
li
ng
/h
eat
i
ng
f
unctio
n
W
ater
l
ea
k
ag
e
W
ater
l
ea
k
ag
e
El
ectr
i
ca
l
l
ea
k
ag
e
I
noperat
i
ve or
b
urn
d
amag
e
I
ncomp
l
ete coo
li
ng
/h
eat
i
ng
f
unctio
n
I
noperat
i
v
e

Table of Contents

Other manuals for Daikin SUPER MULTI NX G Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin SUPER MULTI NX G Series and is the answer not in the manual?

Daikin SUPER MULTI NX G Series Specifications

General IconGeneral
BrandDaikin
ModelSUPER MULTI NX G Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals