Contents
1. General Information
3
2. Preinstallation
7
Planning the Installation Site 7
Receiving the Frequency Converter 7
Transportation and Unpacking 7
Lifting 8
Shipping Weights and Dimensions 8
3. Installation
9
Mechanical Installation 9
Tools Needed 9
General Considerations 9
Installation in Enclosures - IP00 / Chassis units 19
Installation on the Wall - IP21 (NEMA 1) and IP54 (NEMA 12) Units 19
Floor Mounting - Pedestal Installation IP21 (NEMA1) and IP54 (NEMA12) 20
Gland/Conduit Entry - IP21 (NEMA 1) and IP54 (NEMA12) 21
IP21 Drip shield installation (D1 and D2 enclosure) 22
Electrical Installation 23
Control Wires 23
Power Connections 25
Mains connection 34
4. Duct Work Cooling Kit for IP00 Units
35
5. Installation on Pedestal - IP 21 / IP 54 Units
43
6. Start-Up Check
47
Connection Examples 47
Electrical Installation Procedures 47
Programming Procedures - VLT 5000 49
Programming Procedures - VLT 6000 HVAC, VLT 8000 AQUA and VLT 4000 49
Motor Start 50
7. Service During Use
51
8. Drawings
53
Index
58
VLT
®
5000/6000/8000
High Power Installation Guide
Contents
MI.90.J2.02 - VLT
®
is a registered Danfoss trademark
1