Vantage Pro2 Integrated Sensor Suite Installation Manual
Document Part Number: 7395.333 Rev R (11/3/23)
For Vantage Pro2 and Vantage Pro2 Plus Weather sensor suites #6322, 6322W, 6322C, 6323, 6327, 6327C,
6328, 6820, 6820C, 6825, 6825C.
Davis®, Davis Instruments®, WeatherLink®, WeatherLink Live™, Vantage Pro®, Weather Envoy™, ,
Vantage Vue® and EnviroMonitor® are trademarks of Davis Instruments Corporation, Hayward, CA.
Copyright © 2023 Davis Instruments Corp. All rights reserved. Information in this document subject to
change without notice.
Davis Instruments Quality Management System is ISO 9001 certified.
3465 Diablo Avenue, Hayward, CA 94545-2778 U.S.A.
510-732-9229 • info@davisinstruments.com
www.davisinstruments.com
®
Sensor Interface
SENSOR
INTERFACE
MODULE
UV
SUN
RAIN
WIND
TEMP
HUM
+
-
1
2
3
5
6
7
4
8
9
10
1112
1
Solar Panel
Connector
2
AC Adapter Socke
t
3
4
Battery Socket
(wireless only)
Cabled Connection
5
Transmitter ID DIP Switch
6
Test DIP Switch (wireless only)
7
Test LED
8
9
10
11
12
Temperature/Humidity
Sensor Connector
Wind Sensor Connector
Rain Sensor Connector
Solar Radiation Sensor Connector
UV Sensor Connector