EasyManuals Logo

Dea NET230N User Manual

Dea NET230N
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
52
9 INSTALLATION TEST
The testing operation is essential in order to verify the correct installation of the system. DEA System wants to summarize the proper
testing of all the automation in 4 easy steps:
Make sure that you comply strictly as described in paragraph 2 “WARNINGS SUMMARY”;
Test the opening and closing making sure that the movement of the leaf match as expected. We suggest in this regard to perform va-
rious tests to assess the smoothness of the gate and defects in assembly or adjustment;
Ensure that all safety devices connected work properly;
Perform the measurement of impact forces in accordance with the standard 12445 to nd the setting that ensures compliance with
the limits set by the standard EN12453.
10 PRODUCT DISPOSAL
WARNING In compliance with EU Directive 2012/19/EU on waste electrical and electronic equipment (WEEE), this electrical prod-
uct should not be treated as municipal mixed waste. Please dispose of the product and bring it to the collection for an appropriate
local municipal recycling.

Other manuals for Dea NET230N

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dea NET230N and is the answer not in the manual?

Dea NET230N Specifications

General IconGeneral
BrandDea
ModelNET230N
CategoryController
LanguageEnglish

Related product manuals