G – Piping Connection
INM.XX.X.00 G-7 April, 2018
Other Piping Systems and Special Cases
Space Heating and Space Cooling Hydronic Systems
Requirements, outlined in Piping Connection General Considerations (see above), apply to all types of space heating
and/or space cooling fluid systems (water, glycol, etc.) – refer to respective piping termination labels (IN/OUT), main
label (for line sizing) etc.
ATTENTION! If steam space heating coil is used follow respective Code(s) recommendations, field practices
and steam coil and associated equipment (valves etc.) manufacturer’s guidance.
Gas-fired Space Heaters (duct gas heater, gas boiler, etc.)
Follow respective gas heater manufacturer requirements, as well as respective local codes, when piping and
connecting gas line to the heater (pipe sizing, supplied gas pressure, etc.). Refer to heater or dehumidifier
labels and stickers to locate gas connection.
Indoor-installed gas heater (boiler, duct heater, etc.) must be equipped with flue gas venting system – consult
gas heater manufacturer for proper venting system selection.
o Gas heater, packaged with the outdoor dehumidifier, normally would have provision for flue gas
venting, however in some cases (strong wind influences, location specifics, etc.) additional venting
system may be also required – consult gas heater manufacturer for proper type selection.
“Split-Cut” dehumidifier - piping assembly
When dehumidifier is provided from the factory in sections, field-assembly is required, including dehumidifier
internal piping reassembly.
Normally, such dehumidifiers are accompanied with Disassembly and Assembly Instructions – refer as needed.
Remove cups/plugs and join pipes respectively.
o To facilitate reassembly and avoid ambiguity, closely
located pipes are cut at the factory in “checkered”
pattern (see Pic. G.5) – once dehumidifier sections are
aligned properly, respective pipes would align too.
o Follow standard field practices, applicable to respective
pipe material/type and joining methods; ensure that
pipes and couplers are properly cleaned, sanded,
reamed, etc. as applicable. Normally, respective couplers are provided with the dehumidifier.
Pressure test/test for leaks re-joined piping and charge/upcharge re-joined circuit with respective fluid.
o Refer to dehumidifier submittal documentation and main label for respective circuits operating
pressure and media (water/glycol type and mixture ratio, type of refrigerant, etc.).
Follow proper field practices working with refrigeration circuits (brazing with nitrogen,
vacuuming, etc.); refer to recommendations in Outdoor Condenser Piping (see above).
o Depending on various circumstances, split-cut dehumidifier could be shipped with piping circuits
completely empty or partially charged – verify fluid presence in the circuit prior.
Normally, water and/or glycol circuits are provided empty – once joined, circuit must be
charged fully. Refer to Fluid Cooler Piping recommendations for charging.
Fill/upcharge water/glycol at the bottom of the system, bleed the air from ALL top
bleeding valves (manual and automatic). Ensure all air is bled out. Upcharge, if
needed, to achieve min 20-30 psi static pressure at the bottom of circuit.
Pic.G.5

Table of Contents

Other manuals for Dectron DS Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dectron DS Series and is the answer not in the manual?

Dectron DS Series Specifications

General IconGeneral
TypeRefrigerant Dehumidifier
AirflowVaries by model
CapacityVaries by model
Power SupplyVaries by model
DimensionsVaries by model
WeightVaries by model
Operating Temperature5°C to 35°C

Related product manuals