INM.XX.X.00 i April, 2018
Table of Content
C - General Information
C-1
D - Delivery and Storage
D-1
Receiving checklist.
D-1
Shipping Damage handling
D-1
Storage
D-2
E - Mechanical Installation
E-1
Lifting and Rigging
E-1
General Mechanical Installation Requirements
E-2
o General Placement of the Equipment
E-2
o Indoor Dehumidifier Installation
E-2
o Outdoor Dehumidifier installation
E-2
Louvers Installation
E-3
Field-Installed Outdoor Air Filter Rack Installation
E-3
Outdoor Air and Exhaust “Door/Louver” Assembly Installation E-4
Outdoor Condenser and Fluid Cooler Mechanical Installation
E-5
Mechanical Installation - Special Cases
E-8
o Frame-mounted Main Blower(s) Shipping Brackets E-8
o “Split-Deck” Dehumidifier – Mechanical Field Disassembly and Assembly E-9
o “Split-Cut” Dehumidifier – Mechanical Field Assembly E-10
F - Ductwork Connection F-1
Ductwork Layout Considerations
F-1
Duct Connection – General Considerations
F-1
Duct Connection – Special Cases
F-2
G - Piping Connection
G-1
Piping Connection – General Considerations
G-1
Condensate Drain Connection and P-trap Installation
G-1
Pool Water Heating Connection
G-2
Outdoor Air Condenser Piping
G-3
Fluid Cooler Piping
G-5
Other Piping Systems and Special Cases
G-7
o Space Heating and Space Cooling Hydronic Systems G-7
o Gas-Fired Space Heaters G-7
o “Split-Cut” Dehumidifier – Piping Assembly G-7
o Remote gas Boiler Package Installation and Piping Connection G-8