4. The first steps
4.1 Switching on the first time
The drawings below show the wiring of the most important signals. Once all connections to the main units are
done, the units are ready to be switched on.
4.1.1 AGC single application
The most important connections are marked with an arrow.
AGC-4 quick start guide 4189340689 UK The first steps
DEIF A/S Page 8 of 26