In the "commissioning" field above, the horizontal blue line indicates the elapsed time since
the alarm setpoint was exceeded. In this example, the generator reverse power setpoint is -5%.
If the commissioning is done without the PC utility software, the timers can be seen in the serv-
ice menu 9120.
General guidelines for commissioning
4189340703 UK
Protections
DEIF A/S Page 20 of 25