EasyManua.ls Logo

Dell Networking S3100 Series - Installing a 1 U Front-Rack

Dell Networking S3100 Series
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 24. Four-Post Threaded Configuration
Installing a 1U Two-Post
You can install the switch in 1U two-post (flush and center) configurations. Slide the system into the rails
in the same manner as the four-post configurations.
Installing a 1U Front-Rack
To install the switch in a 1U front-rack configuration, configure the rails that are attached to the system.
1. Attach the switch rails (inner chassis members) to the switch. Item 3 in the following illustration
shows the detail for the front standoff with the locking tab.
Installation
33

Related product manuals