PowerEdge T610 Technical Guide      46 
The adapter bracket kit includes 6 brackets to accommodate different rail lengths, plus 4 sets of 
custom screws in common thread sizes. A detailed Getting Started Guide is included in the kit along 
with directions for installing the brackets and mounting the rails into the brackets. 
Depending on the depth of the rack used, it may be necessary to remove the server’s bezel in order 
to close the door of the rack. A minimum of 58 mm will be needed between the back surface of the 
door panel and the front face of the EIA flange for the front door to close with the 11G server bezel 
installed. 
 
  2U Threaded Rack Adapter Brackets Kit Figure 11.
Below is a summary of the rack types supported by the T610 rails. Note that mounting in 2-post racks 
is not supported. 
  Supported Racks Table 15.
 
Other factors to consider when deploying the T610 include the spacing between the front and rear 
mounting flanges of the rack, the type and location of any equipment mounted in the back of the 
rack such as power distribution units (PDUs), and the overall depth of the rack. 
  Rail Adjustability Ranges and Depth Table 16.
Rail Adjustability Range (mm) 
 
The adjustment range of the rails is a function of the type of rack in which they are being mounted. 
The min-max values listed above represent the allowable distance between the front and back 
mounting flanges in the rack. Rail depth represents the minimum depth of the rail as measured from 
the rack front mounting flanges when the back rail bracket is positioned all the way forward.