Do you have a question about the Delta SOLIVIA 2.5 EU G3 and is the answer not in the manual?
Model | SOLIVIA 2.5 EU G3 |
---|---|
Max. input voltage | 550 V |
AC Output Voltage | 230 V |
Maximum DC Input Voltage | 550 V |
Number of MPP Trackers | 1 |
Operating Temperature Range | -25°C to +60°C |
Protection Degree | IP65 |
Rated Output Power | 2500 W |
Max. apparent AC power | 2500 VA |
Max. DC power | 3300 W |
AC Output Frequency | 50 Hz |
Maximum AC Output Power | 2500 W |
Cooling Method | Convection |
Adherence to country-specific safety regulations and utility company conditions is crucial.
Precautions regarding voltage, handling, installation, repair, and isolation of the device.
Warning about dangerous voltage inside the inverter and residual voltage after disconnection.
Installation and commissioning must only be carried out by qualified electrical experts.
Adherence to safety regulations, technical interface conditions, and specific standards.
For DE LVD, PV generator capacity must not exceed 3.68 kW according to VDE AR N 4105.
Requirement for a meter for energy measurement between grid feed-in and inverter.
Integrated anti-islanding protection fulfills section switch requirements.
Secondary short-circuit current rating increases with nominal current.
Guidelines for selecting a suitable location for the inverter.
Specifies clearance, grid impedance, and mounting position requirements.
Utilize the provided mounting plate for installation.
Step-by-step guide for mounting the inverter.
Instructions on lifting the heavy inverter and securing it properly.
Connection via Wieland RST25i3S AC connector.
Use a three-core line (L, N, PE) with min. 2.5 mm² to max. 4.0 mm² conductor.
An automatic circuit breaker (16 A, type B) is required upstream.
Inverter must be grounded via the AC connector's PE conductor.
Note cable length and cross-section for temperature rise and power loss.
AC connector has a clip mechanism for protection against unintentional disconnection.
Check PV voltage polarity at Tyco connectors before connecting.
Uses Tyco Solarlok connectors, coded to prevent incorrect connection.
Avoid contact with terminals; do not disconnect PV modules under load.
Max input voltage 540 V, max current per Tyco connector 18 A.
Unused interfaces must always be closed off.
Details HARTING Deutschland GmbH as mating connector supplier.
Provides order numbers for cable managers.
Schematic showing RS485 connection with terminating resistor.
Details the pin assignment for the RS485 connector.
Electrical connections are made via casing-attached connector contacts.
Under no circumstances should the device be opened.
Step-by-step guide for setting up the device.
All unoccupied connectors and interfaces must be sealed with provided plugs.
Default display language is English.
Prompts for network ID and country selection after self-test.
Option to set AC side power limitation (50%-100%).
Display buttons lock after 5 minutes of inactivity; unlock by switching DC voltage.
Adjusts the brightness of the LCD display from 0 to 9.
Adjusts the LCD background lighting (Auto/On).
Selects the start menu upon restart of the device.
Adjusts the LCD language.
Enters feed-in remuneration in Euro/kWh or GBP/kWh.
Enters the ID number of the solar inverter (1-254).
Accesses the ISO / GND setup menu.
Adjusts country-specific parameters.
Adjusts the baud rate between 2400 and 38400 Baud.
Adjusts the internal clock settings.
Adjusts the current day of the week and date.
Allows adjustment of the firmware.
Identifies and makes faults visible on the display.
General advice on troubleshooting and resetting the inverter.
Lists key parameters displayed in the N menu.
Indicates a fault in the display communication.
Grid frequency outside specified limit range.
Grid voltage outside specified limit range.
Indicates the autotest status is in error.
Indicates that calibration is in progress.
DC component of input-side AC is too high.
Internal communication error or hardware fault.
Device trips and reverts to grid input mode upon temperature drop.
Isolation resistance fault on DC side during start-up or running phase.
Isolation resistance fault on DC side during start-up or running phase.
Warning regarding isolation resistance during start-up.
Warning regarding isolation resistance during running phase.
Connection PV+ to GND interrupted or wrong pole connected to GND.
Connection PV- to GND interrupted or wrong pole connected to GND.
One of the anti-islanding protection output relays is faulty.
Hardware and software versions are not compatible.
Initialization of solar inverter on start-up.
Insufficient input power.
PV generator voltage between 100 V and 150 V.
Check grid voltage and frequency for grid input mode.
Internal varistor at DC input is defective.