D1000 Installation and Service Manual 8
Home LAB-110073 Rev. 3
PREPARING THE INSTALL LOCATION
CAUTION: This should be performed by a licensed electrician. Installation
should be completed according to all applicable codes and regulations. Shut
off power at the main breaker to prevent electrical shock. Use Power Cord
(provided) or, replaced with wire specified by building codes.