14
Local DLB
Select: Set as ‘Primary Charger’
If more than one eVolo charge point is connected to a
network, only one can be set as ‘Primary Charger’
If external load management hardware has not been
installed, e.g. smart meter, CT clamp, the Smart Meter
switch must be set to Off
Total Charger Quantity enter the quantity of EV
Charge Points supplied from the consumer unit,
usually set to 1
Maximum Available Power (kW) set to same figure
as entered in Charge Current Limit, if only one charge
point is connected to the properties supply
Number of Phases select Single-phase
RCD Test
The charge point simulates an earth fault following
on screen instructions
Press Back(<) to return to the main menu showing the EV
charge point serial number located in the ‘Home’ tab
5. The charge point should be tested using an EV charge point tester
After commissioning, the mobile device must be unlinked from the EV charge point by
pressing unlink located in the ‘Bluetooth connected’ field
Note: If power to the charge point is lost during commissioning, Bluetooth data connection
to the mobile device will be lost and the commissioning APP will disconnect from the
charge point.
Once power is restored, please reconnect to the charge point by selecting the serial
number from the Home tab