EasyManuals Logo

Ditch Witch Cx Series User Manual

Ditch Witch Cx Series
123 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #51 background imageLoading...
Page #51 background image
Transport - 50 Cx Series Operator’s Manual
Haul
Load
1. If equipped, put backfill blade in stowed position. See “Backfill Blade” on page 73.
2. Remove parking pin from parking position.
3. Start engine.
4. Set to low throttle.
5. Raise boom clear of trailer, but keep it low.
6. Move machine to rear of trailer and align with ramps.
7. Drive forward slowly to move machine onto trailer until tiedown position is reached.
8. Lower boom to trailer bed, if space allows.
9. Ensure all controls are in neutral position.
10. Shut off machine.
11. Insert parking pin in parking position.
12. Tie down machine.
Horizontal movement. Crushing can cause death or
serious injury. Read and understand operator’s manual and all safety
instructions before use.
Tipover. Crushing can cause injury. When loading/
unloading, run at low throttle. Keep boom low.
IMPORTANT: Boom should be facing ramps.
NOTICE: If loading onto tilt-bed trailer, be prepared for trailer to tilt. Load trencher as far to the
front of trailer as possible.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ditch Witch Cx Series and is the answer not in the manual?

Ditch Witch Cx Series Specifications

General IconGeneral
BrandDitch Witch
ModelCx Series
CategoryFarm Equipment
LanguageEnglish

Related product manuals