EasyManua.ls Logo

Ditch Witch Cx Series - Trench

Ditch Witch Cx Series
123 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transport - 52 Cx Series Operator’s Manual
Haul
Unload
1. Prepare trailer and ramps for unloading.
2. Remove tiedowns.
3. If equipped, open fuel shutoff valve.
4. Remove parking pin from parking position.
5. Start engine.
6. Set to low throttle.
7. Raise boom clear of trailer, but keep it low.
8. Slowly back machine down trailer or ramps.
Retrieve
Under normal conditions, machine should not be towed. If machine becomes disabled and retrieval is
necessary:
Tow for no more than 200yd (180m) at less than 1mph (1.6km/hr).
Use towing chains appropriately rated for maximum towing force.
Attach tow line to all available tiedown points facing towing vehicle.
Steering will be difficult.
Tipover. Crushing can cause injury. When loading/
unloading, run at low throttle. Keep boom low.
NOTICE: If unloading from tilt-bed trailer, be prepared for trailer to tilt.

Table of Contents

Related product manuals