Trench - 56 Cx Series Operator’s Manual
Finish Job
7. Slowly move to desired speed.
8. Operate engine at full throttle when working.
Finish Job
1. When trench is complete, stop movement.
2. Set throttle to half open.
3. Raise boom.
4. Stop digging chain.
5. Raise trench cleaner, if equipped.
6. Install backfill blade and backfill, if desired.
7. Drive a short distance away from work site.
8. Shut off machine.
IMPORTANT:
• Trenching movement is toward
you.
• Always start trenching at low
speed. Increase ground drive speed
only as soil conditions permit.