Operation Overview - 40 JT520 Operator’s Manual
Planning
CMW
Planning
1. Gather information about jobsite. See page 45.
2. Inspect jobsite. See page 46.
3. Classify jobsite. See page 48.
4. Plan bore path. See page 50.
5. Check supplies and prepare equipment. See page 56.
6. Load equipment. See page 66.
Setting Up at Jobsite
1. Prepare jobsite. See page 55.
2. Unload drilling unit from trailer. See page 68.
3. Assemble drill string. See page 75.
4. Position drilling unit and frame. See page 73.
5. Assemble strike system. See page 88.
6. Anchor drilling unit. See page 87.
7. Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.