JT520 Operator’s Manual Transport - 65
Lift
CMW
Procedure
Use a crane capable of supporting the equipment's size and weight. See “Specifications” on page 141 or
measure and weigh equipment before lifting.
1. Attach chains to four lift points (two on each side of drilling unit).
2. Attach each chain securely to cross members.
3. Bring chains together to a central pull point.
IMPORTANT: Length of spreader bars should be equal to width of drilling unit.