Operation Overview - 42 JT520 Operator’s Manual
Leaving Jobsite
CMW
Leaving Jobsite
1. Remove downhole tools. See page 84.
2. Remove anchors. See page 87.
3. Rinse unit and downhole tools. See page 115.
4. Disassemble strike system and disconnect from fluid system. See page 115.
5. Stow tools. See page 115.
6. Load unit onto trailer. See page 66.
Storing Equipment
1. For cold weather storage, antifreeze drilling unit. See page 114.
2. For long-term storage, disconnect battery disconnect switch.