Operation Overview - 36 XT1600 Operator’s Manual
Planning
CMW
Planning
1. Gather information about jobsite. See page 38.
2. Inspect jobsite. See page 39.
3. Classify jobsite. See page 40.
4. Check supplies and prepare equipment. See page 42.
5. Load unit onto truck or trailer. See page 52.
Using Tool Carrier Mode
1. Unload from trailer. See page 54.
2. Drive to job. See page 45.
3. Connect front attachment. See page 64.
4. Operate attachment. See page 66 and attachment operator’s manual.
5. Disconnect front attachment. See page 70.
Using Excavator Mode
1. Unload from trailer. See page 54.
2. Drive to job. See page 45.
3. Dig trench or hole. See page 57.
Leaving Jobsite
1. Rinse unit and stow tools. See page 70.
2. Load unit onto trailer. See page 52.