EasyManua.ls Logo

DITEC BOX - Automation Closure; Routine Maintenance Plan

DITEC BOX
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
IP1529EN
- Insert the casing [9] and fix it using the supplied
screws.
- Screw the bulb into the bulb support.
- Fix the courtesy light casing [8] using the supplied
screws.
- Drill a hole in the control panel casing for the wiring.
Fix the cable gland fastening bracket.
- Fix the casing [16] to the control panel.
7. Automation closure
8. Routine maintenance plan
Perform the following operations and checks every 6 months according to intensity of use of the
automation.
Without power supply and batteries if present:
- Clean and lubricate the moving parts, using neutral grease.
- Check the stability of the automatic system and make sure that all screws are correctly tightened.
- Check the resistance of the fixing points.
Reconnect the 230 V~ power supply and batteries if present:
- Check the power adjustment.
- Check that all commands and safety functions (photocells) are operating correctly.
- Check the batteries are working (continuously) if present, by removing the power supply and
making a series of operations. Once performed, turn on power supply again.
NOTE: For spare parts, see the spares price list.
16
8
9

Related product manuals