PSS5000/INGU/805799/09 17 of 27
PSS 5000 – Installation Guide
2 Installing the PSS 5000 Forecourt Controller
1. Prepare the communication cables by removing the insulation as illus-
trated below.
Note: It is necessary to cut rubber grommet for cables > Ø12 mm.
2. Refer to the Protocol to Port Assignment web service page and insert
each communication cable through the rubber grommet opposite the
relevant HIM.
Illustrated with a Standard cabinet